780 AM | 96.1 FM 

“YOURS FOR WESTERN ALASKA”

(907) 443-5221

September 1997: A solution for drifting snow

Les Brown in Studio C
Longtime volunteer engineer Les Brown in KNOM’s Studio C.

September 25, 1997

Chief engineer Les Brown (pictured) has almost single-handedly built the extended fence around the AM tower, preparing for the mission’s higher-power, 25,000-Watt signal. Snow drifting has always been a problem there, and Les tries an innovative solution.

For (fence) pickets, he uses 1/2-inch plastic pipes, which he figures will be aerodynamic and won’t stop as much snow as wooden slats. It turns out to be an excellent decision. The needed material costs $931, and by doing it himself, Les figures he is saving the mission about $4,500 in labor.

Recent Posts

More

Newsletter:

Christmas 2023

Work for Us:

Jobs

Contact

Nome:

(907) 443-5221 

Anchorage:

(907) 868-1200 

Land Acknowledgement

We acknowledge that KNOM Radio Mission is located on the customary lands of Indigenous peoples. 

Based in the Bering Strait region, KNOM broadcasts throughout the homelands of the Iñupiaq, Siberian Yup’ik, Cup’ik and Yup’ik peoples.