96.1 FM | 780 AM | Yours for Western Alaska

November 1997: Building the generator shed

November 14, 1997

Contractor Randy Pomeranz begins to fabricate the walls for the KNOM transmitter site’s generator shed. Time – and the remaining days of temperate weather – are running out, and the 66-kilowatt generator is waiting to be installed.